Controlling Project Cost Overruns
Source:
Pertmaster
Document Type:
White Paper
This white paper examines how Pertmaster can reduce exposure to project cost risk throughout the project lifecycle by using a combination of a high level cost estimate analysis and a detailed schedule-based cost risk analysis. Contingency and management reserve is also discussed.