Forgot password?
|
|
|
|
We were unable to sign you in.
Please verify your user name and password and try again. If you do not have a TEC account, register now.


  • E-mail White Paper


Controlling Project Cost Overruns


Source: Pertmaster


Document Type: White Paper

Description:

This white paper examines how Pertmaster can reduce exposure to project cost risk throughout the project lifecycle by using a combination of a high level cost estimate analysis and a detailed schedule-based cost risk analysis. Contingency and management reserve is also discussed.


Download <strong>Controlling Project Cost Overruns</strong>
 
comments powered by Disqus






©2013 Technology Evaluation Centers Inc. All rights reserved. Search powered by Google