Case Study Description
Industrial pulley and belt manufacturer Transmission Development was plagued with late deliveries and production bottlenecks. Despite several attempts to implement a computerized information control system to help correct these issues, the company continued to work with its outdated system. Within months of implementing Epicor Vista, Transmission had improved capacity visibility and reduced lead times by 70 percent.
Related Topics: Discrete Manufacturing, Engineer-to-Order (ETO), Inventory Management, Lean/Flow Manufacturing, Manufacturing Management
Related Industries: Industry, Manufacturing, Fabricated Metal Product Manufacturing, Electrical Equipment, Appliance, and Component Manufacturing, Miscellaneous Manufacturing
Related Keywords: Transmission Development, pulley and belt manufacturer, configured-to-order, improved customer service, ERP, Epicor, computerized information control system, production bottlenecks, bill of material, enterprise resource planning
Source: Epicor
|